Monday 29th April 2013
Today the shower screens in the bathroom & ensuite have been installed
Tuesday 30th April 2013
The bathroom & ensuite mirrors were put in today and although I didn't notice at first it makes a big difference. In the bathroom we extended the mirror to go the full length over the bath which I'm glad we did as it makes the bathroom feel a lot bigger than it is.
Tuesday 30th April 2013
The bathroom & ensuite mirrors were put in today and although I didn't notice at first it makes a big difference. In the bathroom we extended the mirror to go the full length over the bath which I'm glad we did as it makes the bathroom feel a lot bigger than it is.
The bath has not been installed and the other day had a note on it saying the cut out was too small, today it looks like the cut out has been measured ready to be made bigger.
Another change today was the temporary fencing has been taken away ready for the site to be cleared which our building supervisor told us would happen later this week.
The expanding stuff that goes in the brickwork was also done today
Wednesday 1st May 2013
Not much to see today, just a clean up of the site.
Friday 3rd May & Saturday 4th May 2013
The most exciting thing to happen this week is defiantly the timber flooring. I'm very happy with the way it has come up. On Friday the entry, kitchen, dining, lounge & study was laid with the Rumpus & edging being finished on Saturday.