Monday 29 April 2013

Construction - Week 19

 
Monday 29th April 2013
 
Today the shower screens in the bathroom & ensuite have been installed



Tuesday 30th April 2013

The bathroom & ensuite mirrors were put in today and although I didn't notice at first it makes a big difference. In the bathroom we extended the mirror to go the full length over the bath which I'm glad we did as it makes the bathroom feel a lot bigger than it is.

 
 
 
The bath has not been installed and the other day had a note on it saying the cut out was too small, today it looks like the cut out has been measured ready to be made bigger.
 
 
 
Another change today was the temporary fencing has been taken away ready for the site to be cleared which our building supervisor told us would happen later this week.
The expanding stuff that goes in the brickwork was also done today
 
 
 
 
Wednesday 1st May 2013
 
Not much to see today, just a clean up of the site.
 
 
Friday 3rd May & Saturday 4th May 2013
 
 
The most exciting thing to happen this week is defiantly the timber flooring. I'm very happy with the way it has come up. On Friday the entry, kitchen, dining, lounge & study was laid with the Rumpus & edging being finished on Saturday.
 
 
 

 


SS Update

 
 
I have just spoken to our Site Supervisor and have booked in our Practical Completion Inspection for the 17th May which is exciting but unfortunatly still a couple of weeks away. We have been told that handover should be 7-10 days after that. 

Thursday 25 April 2013

Construction - Week 18 Continued


Wednesday 24th April 2013
This week is turning out to be a very productive week, today was dominated by plumbing.
The basins have been installed in both the ensuite & bathroom
 
 
 
both the toilets have been installed
 
 
The shower railes have been installed in both the bathroom & ensuite
 
 
and the bath taps, but no bath
 
 
All external taps have also been installed by the plumber will still need to come back to do the laundry taps.
 
 
 The heating vents were also finished today as well as the return air vent & the control was installed
 
 
 
Thursday 25th April 2013
 
Today is Anzac Day so we wern't expecting anything to be done today but got a text message from my mum who had driven past the house to say someone was working so we went out later to see what had been done.
 
The walk in robe, wardrobes in the bedrooms, pantry and linen press have all been fitted out with rails and shelves.
 

 
 
 
When we were there there were also cleaners in cleaning the windows & cupboard shelves & also someone putting insulation in the roof.
 
 
 Friday 26th April 2013
 
Today our garage door was installed
 
 

Monday 22 April 2013

Construction - Week 18

Monday 22nd April 2013
 
Electrical
 
We were excited to see that something has actually been done at our house today. The electrician has been in & installed the lights, light switches, power points, smoke detectors & bathroom/ensuite/toilet fans, TV points & data points




 
We were lucky to be able to get inside and have a chance to check that everything has been done that was meant to be done, all the lights seem to be connected to the right switches & everything seems to be in the right place. My only concern is that in all 4 bedrooms we have added provisions for future fans in our electrical contract theses seems to look different to the normal lights & appear to have a double switch however in the house they dont so i will need to look into this & make sure it has been done.
 
We didnt include any external lights but did include the wiring for us to add the lights at a later date. We have also added a few external weather proof power points that were also put in today.
 
 
 
 
 
Tuesday 23rd April 2013
 
Today all the door handles & door stops have been fitted
 
 
 
 
Finally the 40mm Casar Stone for the island bench in the kitchen came today and the kitchen sink has also been installed
 
 
 
 
 
 
 
 
 

Tuesday 16 April 2013

Construction - Week 17

 
Wednesday 17th April 2013
 
Well despite advise from our Site Supervisor that there is only 3 weeks left til our PCI nothing has been done at the house for a week now, still leaving alot to do in such a short time.
 
We have also noticed that the Magpie vent that in meant to be in the laundry is not there and since it needs to go through the brickwork & Plaster, i would have thought this is something that would have been done by now...have left a message for SS to call to see whats going on with this....


.....Have spoken with SS and have now been told all trades have been booked to do their respective fit offs and PCI will be mid May, very frustrating as we were originally told hand over would be end of April now we are looking at end of May at best. Regarding the Magpie vent we are being told this will be done post PCI which seems very strange. Still nothing done at the house today.


Thursday 18th April 2013

Today the Casar Stonew bench tops were put in in the Bathroom, Ensuite & the back bench in the Kitchen, The 40mm front bench in the kitchen is still to come.

Tuesday 9 April 2013

SS Update

 
 
I spoke to our Site Supervisor today, he advised the tiles will be completed by the end of this week & our Practical Completion Inspection will be approximatly 3 weeks after.
 
There is still quite a bit to get done in this time the main things that i can think of being:
 
- Caesar Stone Benches (there has been a hold up with these and the are expected by the end of next week)
- Garage Door
- Electrical fitout
- Plumbing Fitout
- Wardrobe & cupboard fitouts
- Carpet
 - Laminate Flooring
- External painting including render
- door handles
- Fly Screens



Monday 8 April 2013

Construction - Week 16

Monday 8th April 2013
 
Today the rest of the floor tiles were laid as well as the top of the bath. The titles skirting is still to be done as is the showers & splashbacks in both the bathrooms & laundry


Tuesday 9th April 2013

Today the titled skirting & the grout in the Laundry was completed, leaving only the splash back to be done in this room

 
In the toilet & bathroom the tiled skirting was also completed, the tiles on the side of the bath have been done minus 1 tile (i'm not sure why) & the shower has been tiled as well but hasn't got grout.
 
No tiling has been done in the ensuite today.
 
 
Wednesday 10th April 2013
 
Today was more tiling, the ensuite skiting has been complete and the floor grouted. The shower has also been tiled but is still waiting for grout.
 
 
 
The toilet appears to be complete as well as the bathroom apart from the tiled splashback as we are waiting for the bench tops to arrive which have been delayed and wont be here until the end of next week
 
The laundry has also been finished and we are very happy with the way it has all come together.
 
 
 

Tuesday 2 April 2013

Construction - Week 15

Tuesday 2nd April 2013
 
 
Today it appears the internal painting has been finished
 
 
 
 
& the external painting has been started, the alfresco ceiling has been painted as well as the portico ceiling
 
 
 
We have also had a delivery of tiles
 
 
 
It has been nice to visit our house and actually see some progress after a very slow couple of weeks.
 
 
 
Wednesday 3rd April 2013
 
Today the water proofing for the bath & both the showers was done
 
 
 
Thursday 4th April 2013
 
The tiles in all the wet areas were started today. It appears that only full tiles have been laid, where the titles that require cutting to size will go have not been started. Some of the pictures make the tiles look more browny but they are actually a grey colour. No grout has been done either.