This week is turning out to be a very productive week, today was dominated by plumbing.
The basins have been installed in both the ensuite & bathroom
 
 
 
both the toilets have been installed
 
 
The shower railes have been installed in both the bathroom & ensuite
 
 
and the bath taps, but no bath
 
 
All external taps have also been installed by the plumber will still need to come back to do the laundry taps.
 
 
 The heating vents were also finished today as well as the return air vent & the control was installed
 
 
 
Thursday 25th April 2013
 
Today is Anzac Day so we wern't expecting anything to be done today but got a text message from my mum who had driven past the house to say someone was working so we went out later to see what had been done.
 
The walk in robe, wardrobes in the bedrooms, pantry and linen press have all been fitted out with rails and shelves.
 

 
 
 
When we were there there were also cleaners in cleaning the windows & cupboard shelves & also someone putting insulation in the roof.
 
 
 Friday 26th April 2013
 
Today our garage door was installed
 
 