With less than 2 weeks til our PCI the list of outstanding things is slowly getting shorter
 
Bathroom & Ensuite
 
  • The Basins & Bath are in but they are yet to be fixed
  • There is a missing tile on the edge of the bath (so the plumbing for the bath can be connected) this needs to be complete
  • The Grout on the splashbacks need to be finished
  • The shower drain need to be put in
Laundry
  • The laundry Taps need to be installed
  • The magpie vent needs to be completed
Kitchen
  • Glass splash back needs to be installed
  • All appliances need to be installed
Internal
  • All carpet needs top be laid
External
  • All external painting needs to be done
  • Portico needs to be painted
  • Fly screens to all windows
  • Gap in brick work above the ensuite window needs to be filled
  • The rear garage door needs to be painted and hung
 
 
Monday 6th May 2013
 
Today the external painting began with the render being painted. I'm very happy with the way it has come up.  



Tuesday 7th May 2013

Today the underlay was laid for the carpet

 
Wednesday 8th May 2013
 
Today the plumber returned & connected the bath & fixed the missing tile.
He also connected the laundry taps which now makes the laundry complete (except for the magpie vent which we have been told will be done between PCI & handover)
 
 
 
 
The painters were also back & finished all the external painting except the portico. They also painted the rear garage door.

 
 
 
Thursday 9th May 2013
 
Today the carpet was laid, it is a little browner than what I pictured it to be & the photos make it look even browner than it is & really don't do it justice at all. Although it is browner it still ties in well with our colours
 
 
The tiler was back and finished the grout in the bathroom & ensuite, leaving only the sealing to be done which we have been told will be tomorrow.
 
 
The cleaners were also back today, it has made such a difference to everything to see it clean rather than covered with dust & dirt
 
 
 
 Friday 10th May 2013
 
 Today the basins & bath we fixed and the bathrooms sealed, the shower drains were also put in meaning that the bathroom & ensuite are now complete.
 
 
The rear garage door has been hung, the gap in the brickwork above the ensuite window has been fixed & all the fly screens are on.

2 comments:

  1. Very exciting!!!! Love the pictures! It all looks beautiful!

    ReplyDelete
  2. Hi love your house
    We are building with pd the drysdale too :)
    Just wabted to know how did you get the squarish bath as they told us the oval was the only option

    ReplyDelete