Thursday 16 May 2013

Practical Completion Inspection


Today we had our Practical Completion Inspection (PCI).  It went reasonably well with nothing major to be fixed. The things that need attention are:
 
Entry
  • Weather seals on entry door
  • Repaint entry door as it has a few scratches on the exterior side
  • Paint touch ups
Master/Ensuite/WIR
  • Centre tiles above niche in ensuite shower to be replaced
  • one of the vanity doors in the ensuite has a couple of red marks on it 
  • Paint touch ups
Lounge/Dining/Kitchen
  • Replace some quad to the flooring in the dining/lounge area
  • Clean off glue to some window frames
  • clean marks on the island bench
  • Add globe to living room batten
  • Paint touch ups
Rumpus Room
  • silicone bench top to wall in rumpus room
  • relace damaged quad to flooring
  • repair gaps between skirting boards & quad (nail in)
  • Paint touch ups
Laundry
  • replace fly screen in laundry as it isn't square & doesn't fit window
  • Magpie vent to be inserted
  • Clean the runs in the sliding external door
  • Paint touch ups
Hallway
  • Replace globe to Batten
  • Clean mud marks off man hole
  • Paint touch ups
Bedroom 2
  • Adjust levels of the robe doors so they close flush
  • repair hole in the floor & the back of the robe
  • Paint touch ups
Bedroom 3
  • Adjust robe doors to close flush
  • Clean window frame
  • Paint touch ups
Bedroom 4
  • Remove glue from window frame
  • Paint touch ups
Bathroom
  • clean grout on floor
  • Repair tile on bath hob as it sits above the trim
  • Mark on bench top
  • Silicon Bath hob to wall
  • repair tile on side of shower that is not straight
  • Paint touch ups
Garage
  • Finish skirting around the rear door
  • Replace rear door handle
  • Clean the brickwork around external door
  • Paint touch ups
External
  • Add infill above the master bedroom window
  • Cracked brick at the bottom of alfresco wall
  • Chip to alfresco slab
  • Repaint outside of alfresco beam
  • Touch up infill above the garage door
  • Brick cleaning touch ups
Our Site supervisor estimates everything will be finished and ready for handover on Tuesday 28th May.