Tuesday 5 November 2013

3 Mont Inspection Repairs

Tuesday 22nd October was the day all the tradesmen were booked in to undertake the repair and fix the issues picked up in our 3 month inspection.
 
Tradies stated showing up for 8am onwards and all repairs were attended to, all except the ensuite shower. It was looked at by different people and it was established that the water leak is quite sever and has gone through to the timber frame but luckily not to the timber flooring which is in the study on the othersider of the wall.
 
We have another inspection (I'm not sure why we need another one, just to waste time probably) on the 12th November and they will then arrange to start work which will involve pulling out the shower, tiles, plaster and who knows what else and redoing the whole thing.
 
 In the mean time no showering in the ensuite shower!

No comments:

Post a Comment